Skip links

Nepal Portfolio Energy

Upper Chuwa Lurupya Khola PRoR Hydroelectric Project

 

Installed Capacity: 110.20 MW
Estimated Cost (Million USD): 167.00
Average Revenue (per Year Million USD): 31.00
Total Energy: 575.33 GWh
Design Discharge: 31.2 m³/s
Gross Head: 392 m